OFFSHORE WTG AND CABLE INSTALLATION Client Rep. - Quanta Consultancy Services

This job expired on 27-04-2012

Browse Renewable Energy Jobs by Region

Browse Renewable Energy Jobs by Job Categories

Here are some similar jobs for you to consider...

  • Heat Pump Installer (Engineer) 27 days ago

    Kingston Upon Thames, Guildford, Crawley
    Salary band: £30k - £40k

    A Heat Pump Installer is required by a well-established renewable energy contractor based in Surrey / London. The company have been running since the late 80's and currently specialise in renewable...

  • Offshore Superintendent 20 days ago

    UK
    Salary band: Any

    Job Title: Offshore Superintendent Job Type: Permanent Salary: DOE + Offshore Allowance Location: International Consultant: Nathalie George Reference: OSNG The Organisation: The Green Recruitment...

  • Controls And Instrumentation Engineer 16 days ago

    Glasgow, Bristol, Edinburgh
    Salary band: £40k - £50k

    Position: Control & Instrumentation Engineer (Electrical EngineeringLocation: Edinburgh / Glasgow / Basingstoke / Chelmsford or BristolSalary: up to £50,000 dependent on experienceI'm currently...

  • Insulation Sales Consultant 13 days ago

    North West, Cheshire, Lancashire

    Insulation Sales Consultant North West We are seeking a professional Sales Consultant for a high level role within an exciting and rapidly growing renewable energy company. Making use of our in...

See more jobs like this >>

Job Details

Salary band: £100k +
Salary Details: EU0 - EU700 per day
Location: Denmark
Job type: Contract
Company: Quanta Consultancy Services
Contact: Martho Becht
Job Categories: Environmental Jobs
Posted: 20/04/2012
Expires: 27/04/2012
Currently our end client, a leader in the field of constructing, operating and maintaining offshore wind farms, is urgently looking to secure the services of an experienced OFFSHORE WTG AND CABLE INSTALLATION Client Rep as per the below specification:


Daily (DPR) reporting to the Offshore Installation Manager.
 Following and reporting on subcontractor progress.
 Nurse & Protect Anholt Wind Farms’s Cables.
 Reporting relevant QHSE issues in cooperation with the QHSE department.
 Recording weather down time.
 Be aware of weather parameters regarding. WOW
 Recording Technical breakdown
 Be aware and know the technical requirements for the installation.
 In charge of daily communication about for certs regarding cable operation.
 To be provided with proper documentation to be able to carry out the job in a professional manner.
 To be provided with a phone list of essential personnel regarding cable ops.
 Permits and permissions for ALL crossings.
 Enforce Exclusions zones
 Visual Inspection of each array cable prior to installation
 Visual Inspection of each layer during installation of export cable
 Collect evidence such as pictures i.e.
Data collection
During the offshore installation, the employer representative (client rep.)
collects timing and remarks on the predefined activities.
 The collected observations are entered in the DPR database on, at least, a daily basis


2 weeks on duty and 2 week of duty with 7 working days per week